Client Dashboard

The DHA Signature

Plot 42, Block C, DHA Phase 8, Lahore · 5 Marla

Current Stage

Stage 2 · Grey Structure

Project Timeline

Stage 1 · Foundation & Excavation

Completed

Independent soil test, anti-termite pre-treatment, RCC foundation pour to engineer's drawing. 7-day wet curing and slump tests on every batch. Signed off by independent structural engineer.

Structural Sign-off Document

Uploaded: 15 Jan 2026

View PDF

Stage 2 · Grey Structure

In Progress

Plinth beam, columns, load-bearing brickwork, block-work and slab pours. Reinforcement strictly as per structural drawings. Cube tests at every 50 m³ of concrete.

Structural Sign-off Document

Pending slab pour — Aug 2026

Stage 3 · Interior Design & Finishing

Upcoming

MEP, plaster, flooring, kitchen & wardrobes, paint, fixtures. Designed by the Sutoon Lahore studio; sourced against transparent bills of quantity.

Stage 4 · Handover & Possession

Upcoming

Snagging walk-through, third-party inspection, as-built dossier handover and 12-month defect liability period.