The Sutoon Journey

Foundation.
Grey Structure.
Interior Design.
Handover.

One continuous journey, four transparent milestones. Whether you are sitting in Gulberg, Mayfair or Dubai, you will see exactly what is happening on your plot — every pour, every brick, every fixture — and you only release funds once the next stage is independently inspected.

01

Foundation

Buniyaad · بنیاد · 6–10 weeks

The single decision that decides whether your home lasts fifty years or ten. We treat the foundation with the seriousness it deserves: independent soil testing, engineered excavation depth, anti-termite pre-treatment, and structural concrete poured strictly to the structural engineer's drawings.

  • Independent soil & water-table testing
  • Excavation to engineered depth
  • Anti-termite pre-treatment (Biflex / Termidor-class)
  • Lean concrete blinding
  • Steel reinforcement as per RCC drawings
  • Foundation concrete pour (PACCO / Bestway OPC)
  • 7-day wet curing, slump tests on every batch
  • Independent structural sign-off
~10–15% of total contract
6–10 weeks typical duration
48 photos uploaded to your dashboard
1 of 4 milestone payments
02

Grey Structure

Gri Structure · گرے سٹرکچر · 5–8 months

The skeleton of your home. Plinth, columns, load-bearing walls, beam-and-slab roof — all poured and laid to the structural drawings, with third-party cube tests and slump tests on every batch of concrete. This is the longest stage and where most corner-cutting happens on the market. We do not cut corners.

  • Plinth beam casting & brickwork up to DPC
  • Column reinforcement & shuttering
  • Load-bearing brickwork (first-class Wah or Multani)
  • Lintel, sun-shade and parapet work
  • Roof slab reinforcement, slab pour
  • DPC (damp-proof course) at plinth level
  • Anti-seismic detailing where required (Zone 2A/2B)
  • Pre-plaster concealed plumbing & electrical
~30–35% of total contract
5–8 months typical duration
Cube tests every 50 m³ of concrete
2 of 4 milestone payments
03

Interior Design & Finishing

Interiors · اندرونی ڈیزائن · 3–6 months

Where the home becomes yours. Our Lahore studio handles the full design package — joinery, finishes, lighting, kitchen — and our site team executes it. Every fitting is sourced against a transparent bill of quantities, with at least three branded options per item. No "equivalent" substitutions without your written approval.

  • MEP rough-in: electrical, plumbing, HVAC ducting
  • Plastering (internal & external)
  • Waterproofing for wet areas & roof
  • Floor & wall tiling (whites, kashmir, granites)
  • Custom kitchen & wardrobes (factory-finished)
  • Paint, finishes, wood polish, farmhouse ceilings
  • Light fixtures, switches, branded hardware
  • Final fit-out, deep clean, snagging list
~35–45% of total contract
3–6 months typical duration
3 quotes per material item
3 of 4 milestone payments
04

Handover & Possession

Possession · قبضہ · 2–4 weeks

The day we hand over the keys — and the file. You receive a full as-built dossier: structural drawings, MEP layouts, materials warranties, third-party inspection reports, and a 12-month defect liability period during which we return to fix anything that surfaces.

  • Joint snagging walk-through
  • Independent third-party inspection
  • As-built drawings & MEP layout handover
  • Material warranties bound & delivered
  • Utility activation support (SNGPL, LESCO, K-Electric)
  • 12-month defect liability period
  • Annual maintenance plan optional
  • Final client portal handover
~10–15% final payment
2–4 weeks typical duration
12-month defect warranty
4 of 4 milestone complete
Indicative Pricing

What does each stage cost?

Approximate ranges for a standard 10 Marla home in DHA / Bahria Town. Final pricing depends on design, finishes and site — we share a fixed quote inside 48 hours of your consultation.

Stage 1

Foundation
Only

Rs 28–35 Lakh
£ 9,500–12,000

Plinth-and-below, sign-off included.

Stage 1 + 2

Grey Structure
Complete

Rs 1.05–1.30 Crore
£ 32,000–40,000

Plinth + columns + slabs + roof. Lock-up, weather-tight.

Stage 1 + 2 + 3

Grey Structure
+ Interior

Rs 2.40–3.20 Crore
£ 74,000–100,000

The full journey. From foundation to a finished, branded interior. Most popular.

Stage 3 Only

Interior
Fit-Out

Rs 1.20–1.90 Crore
£ 37,000–58,000

Already have a grey structure? We take it to handover.

Get a precise quote for your plot
The Time To Start Is Now

Build it once. Build it right.

Whether you want only the grey structure signed off, or the full foundation-to-interior journey, we are accepting commissions for plots in DHA, Bahria Town and Gulberg.